Call Toll Free 877-217-3590

Efficient Frac Sand Removal

Eliminate Workovers Due to “Sand Locking” Rod Pumps

Download Full Presentation: Eliminate Workovers Sand Locking

Problem: Operator cannot produce well for more than 4-5 days due to leftover frac sand in wellbore.

Solution: Install JJ Tech Reverse Flow HSP Jet Pump to bring frac sand to surface along with production.

Results: Well has proven productive, and JJ Tech Jet Pump recovers 1-5 gallons of 20/40 mesh frac sand to surface daily.

Advantages of Jet Pump vs. Rod Pump

• JJ Tech Jet Pump can produce moderate to high volumes of sand.
• Gas can be brought to the market immediately.
• No backpressure is put on formation (as with Nitrogen).
• Software can calculate PBHP based on production volumes.

Download Full Presentation: Eliminate Workovers Sand Locking
Do you need
faster fluid removal?